haylaavo

PETRONENGG

PETRONENGG · NSE · inactive
5.25
-0.25 (-4.55%)
as of 18 Feb 2020 close
Open
5.45
High
5.45
Low
5.25
Prev close
5.50
52w high
25.00
18 Feb 2019
52w low
5.25
18 Feb 2020
VWAP
5.25
Delivery %
—
n/a
Volume 86 · NSE bhavcopy (official close) · history since 03 Jan 1996
Series
BE
F&O
No
Status
Inactive since 02 Apr 2019

Earlier name: Petron Engineering Cosntruction Ltd (until 10 Oct 2006).

Source: NSE equity master · as of 01 Apr 2019

Daily · NSE EOD
Exchange announcements
Source: NSE corporate filings · latest Today 18:26 IST
  • 23 May 2013 12:40
    Board meeting

    Petron Engineering Construction Limited has informed the Exchange that the Board of Directors of the Company at its meeting held on May 17, 2013: (1). Mr. Sanjay Jain has been appointed as Additional Director (Non - Executive-Independent) on the Board, w.e.f. May 17, 2013. (2). Dr. S. Rama Iyer has resigned as Director (Non-Executive - Independent) from the Board of the Company. With this, the strength of the Board of Directors is three(3).

  • 17 Apr 2013 13:08
    General update

    Petron Engineering Construction Limited had informed the Exchange that the Company had informed that Mr. T. S. Das had resigned as Managing Director as Well as from the Board, but will continue as Chairman (Emeritus) (Non-Executive). The Company has now informed the Exchange that Mr. T.S. Das has discontinued as Chairman (Emeritus) (Non-Executive) with immediate effect.

  • 11 Mar 2013 19:44
    Management

    Petron Engineering Construction Limited has informed the Exchange that Mr. G. K. Roy, Director (Operations) has resigned from the Board of the Compnay w.e.f. the closing hours of March 08, 2013. With this, the strength of the Board of Directors has reduced from Four Directors to Three Directors.

  • 04 Mar 2013 14:40
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company has received letter of Intent from NCC Limited, Madhapur, Hyderabad for Services of "Erection, Testing, Commissioning, Performance and Guarantee Testing for Boiler and Auxiliaries Package" for NCC Power Project (2 x 660 MW) for a total Contract Price of Rs. 126.50 Crores (Rupees One Hundred and Twenty-six Crores and Fifty Lakhs Only), excluding the Service Taxes.

  • 04 Mar 2013 12:44
    Legal

    Petron Engineering Construction Limited has informed the Exchange regarding the untimely demise of Mr. R. Sankaran, Non-Executive Director - Independent on February 28, 2013. With this, the strength of the Board of Directors has reduced from Five Directors to Four Directors.

  • 31 Jan 2013 18:59
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results along with the Limited Review Report for the period ended December 31,2012.

    PDF · -
  • 31 Dec 2012 19:40
    General update

    Petron Engineering Construction Limited has informed the Exchange that "We have received Order from Madras Cements Ltd. for Mechanical, Electrical & Instrumentation Fabrication and Erection works for the proposed cement Grinding Unit at Anakapalli Visakhapatnam for a total value of Rs.41.50 Crores".

  • 30 Oct 2012 17:09
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results along with the Limited Review Report for the period ended September 30,2012.

    PDF · -
  • 08 Oct 2012 08:58
    Management

    Petron Engineering Construction Limited has informed the Exchange that, at a Board Meeting of the Company held on October 05, 2012, Mr. Ajay Hans has been appointed as the Managing Director of the Company w.e.f. October 05, 2012.

    PDF · -
  • 21 Aug 2012 18:13
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the Minutes of the Annual General Meeting of the Members of the Company held on August 02, 2012.

    PDF · -
  • 14 Aug 2012 17:33
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended June 30,2012.

    PDF · -
  • 06 Aug 2012 09:42
    Other

    Petron Engineering Construction Limited has informed the Exchange regarding the Outcome of Annual General Meeting of the Company held on August 02, 2012.

    PDF · -
  • 11 Jul 2012 13:20
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the Notice of Annual General Meeting of the Members of the Company to be held on August 02, 2012.

    PDF · -
  • 22 May 2012 15:03
    Corporate action

    Petron Engineering Construction Limited has informed the Exchange that the Register of Members & Share Transfer Books of the Company will remain closed from July 24, 2012 to August 02, 2012 (both days inclusive) for the purpose of declaration of Dividend for the year ended March 31, 2012 & holding of Annual General Meeting (AGM).

  • 21 May 2012 09:44
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended March 31,2012.

    PDF · -
  • 21 May 2012 08:25
    Dividend

    Petron Engineering Construction Limited has informed the Exchange that the Board of Directors of the Company at its meeting held on May 18, 2012 has recommended Dividend of Rs. 2/- (20%) per Equity Share on 7538400 Equity Shares of Rs. 10/- each for the year ended March 31, 2012.

  • 10 May 2012 15:07
    Other

    Petron Engineering Construction Limited has informed the Exchange that the Company opt to submit Audited Financial Results for the Financial Year April 01, 2011 to March 31, 2012 on or before May 30, 2012.

  • 24 Apr 2012 17:06
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company have received a Fax of Acceptance from GAIL (India) Limited, (A Government of India Undertaking - A Navratna Company) for Gas Processing Unit at Pata. U.P. for Petrochemical Complex - II Project for a total Order Value of Rs.67.08 Crores apprx.

  • 05 Mar 2012 13:28
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company have received a Fax of Acceptance from GAIL (India) Limited, (A Government of India Undertaking - A Navratna Company) for Gas Cracking Unit at Pata for Petrochemical Complex - II Project for a total Order Value of Rs.192.34 Crores apprx.

  • 15 Dec 2011 08:38
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company has received Orders from Lanco lnfratech Limited, for Supply of Electrical Equipment and Erection, Testing & Commissioning of Electrical Erection Package for their 2 x 600 MW Thermal Power Project at Dist. Dhenkanal, Odisha, India for a total Order Value of Rs. 31.60 Crores.

  • 30 Nov 2011 12:28
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company has received a Fax of Acceptance from GAIL (India) Limited, (A Government of India Undertaking - A Navratna Company) for Cracker Furnace Package at Pata for Petrochemical Complex - II Project, for a total Order Value of Rs.104.93 Crores apprx.

  • 14 Nov 2011 19:31
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended September 30,2011.

    PDF · -
  • 27 Sept 2011 18:37
    General update

    Petron Engineering Construction Limited has informed the Exchange that the Company has been awarded a contract by Lafarge India Pvt. Ltd., Mumbai for Mechanical Erection, Electrical and Automation Installation for its 5000 TPD Cement Plant Project at Chittaurgarh, Rajasthan, India for an apprx. Contract Value of Rs. 66.50 Crores.

  • 22 Sept 2011 12:12
    Insider / SAST

    Petron Engineering Construction Limited has submitted to the Exchange a Copy of Disclosure under Regulation 13(3) of SEBI (Prohibition of Insider Trading) Regulations, 1992.

    PDF · -
  • 19 Sept 2011 13:52
    Insider / SAST

    UTI Asset Management Company Limited has submitted to the Exchange a copy of Disclosure requirement in terms of (Chapter IV) Regulation 13(3) of SEBI (Insider Trading) (Amendment) Regulations 2002.

    PDF · -
  • 09 Aug 2011 16:24
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended June 30,2011.

    PDF · -
  • 19 Jul 2011 19:05
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the minutes of the Annual General Meeting of the members of the Company held on July 07,2011.

    PDF · -
  • 08 Jul 2011 19:37
    Other

    Petron Engineering Construction Limited has informed the Exchange regarding the Outcome of the Annual General Meeting of the Company held on July 07, 2011.

    PDF · -
  • 15 Jun 2011 12:58
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the Notice of Annual General meeting of the members of the company to be held on July 07, 2011.

    PDF · -
  • 07 Jun 2011 09:11
    Corporate action

    Petron Engineering Construction Limited has informed the Exchange that the Company has fixed the Book Closure dates from June 27, 2011 to July 07, 2011 (both days inclusive) for the purpose of declaration of dividend for the year ended March 31, 2011 and holding of the Annual General Meeting.

  • 23 May 2011 15:46
    Corporate action

    Citigroup Global Markets India Private Limited has informed the Exchange that Public Announcement ("PA") is being issued by Citigroup Global Markets India Private Limited ("Manager to the Offer"), on behalf of KazStroyService Global B. V.("Acquirer") and KazStroyServices Limited ("KSS UK"), KazStroyService Holding B.V. ("KSS Holding"), KazStroyService Infrastructure B.V. ("KSS Inra"), Fraseli Investments S.a.r.l. ("FI"), Amritha Sharanya Leasing and Investments Private Limited ("Amritha"), SRA Finance and Investments Private Limited ("SRA"), Petron Investments Private Limited ("PIPL") and Kazs

    PDF · -
  • 19 May 2011 19:06
    Management

    Petron Engineering Construction Limited has informed the Exchange that Mr. Arvind Dabar, Non-Executive Director has resigned from the Board of the Company w.e.f. May 17, 2011. With this, the strength of the Board of Directors has reduced from Five Directors to Four Directors.

  • 19 May 2011 10:09
    Other

    Petron Engineering Construction Limited has informed the Exchange vide notes to Accounts in the Audited Financial Results for the Year ended March 31, 2011 (taken on record by the Board of Directors of the Company at its meeting held on May 17, 2011) regarding Auditors Observations.

    PDF · -
  • 18 May 2011 09:42
    General update

    Petron Engineering Construction Limited has submitted to the Exchange a copy of details required under Clause 20 of the Listing Agreement for the financial year ended March 31, 2011.

    PDF · -
  • 17 May 2011 18:34
    Dividend

    Petron Engineering Construction Limited has informed the Exchange that the Board of Directors of the Company at its meeting held on May 17, 2011, has recommended Dividend of Rs. 2/- (20%) per Equity Share on 7538400 Equity Shares of Rs. 10/- each for the year ended March 31, 2011 for declaration at the Annual General Meeting, absorbing a sum of Rs. 1,50,76,800/- towards Dividend and Rs. 24,45,834/- towards Corporate Dividend Tax aggregating to Rs. 1,75,22,634/-.

  • 17 May 2011 18:00
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended March 31,2011.

    PDF · -
  • 05 May 2011 10:19
    Other

    Petron Engineering Construction Limited has informed the Exchange that the Financial Year of the Company has ended on March 31, 2011. The Company opt to submit Audited Financial Results for the Financial Year April 01, 2010 to March 31, 2011 on or before May 30, 2011.

  • 18 Feb 2011 11:59
    Other

    Petron Engineering Construction Limited has informed the Exchange that the auditors have conducted the limited review for the un-audited financial results for the quarter ended December 31,2010. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements).<a href=/content/corporate/PETRONENGG_LR_18022011.zip target=NEW> For more details click here.</a>

  • 01 Feb 2011 15:44
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended December 31,2010.

    PDF · -
  • 31 Dec 2010 12:39
    Management

    Petron Engineering Construction Limited has informed the Exchange that the Board of Directors of the Company at its meeting held on December 28, 2010 approved the Re-appointment of Mr. T.S.Das as Managing Director for a further period of two years w.e.f. January 11, 2011, subject to approval of the Shareholders.

  • 24 Nov 2010 15:46
    Other

    Petron Engineering Construction Limited has informed the Exchange that the auditors have conducted the limited review for the un-audited financial results for the quarter ended September 30,2010. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements).<a href=/content/corporate/PETRONENGG_LR_24112010.zip target=NEW> For more details click here.</a>

  • 29 Oct 2010 18:13
    Management

    Petron Engineering Construction Limited has informed the Exchange that Mr.Arvind Dabar has been appointed as Additional Director (Non-Executive) on the Board, w.e.f. October 29, 2010.

  • 29 Oct 2010 16:55
    Results

    Petron Engineering Construction Limited has submitted to the Exchange the Standalone Financial Results for the period ended September 30,2010.

    PDF · -
  • 22 Oct 2010 14:39
    AGM / meeting

    Petron Engineering Construction Limited has informed the Exchange that the Members of the Company by way of Postal Ballot have passed the following Ordinary / Special Resolutions with requisite majority: (1) Ordinary Resolutions: (a) Increase in the borrowing limits of the Company from Rs.400 Crores to Rs.800 Crores in excess of the paid-up Share Capital and Free Reserves of the Company.(b) Secure the borrowings from time to time by creation of charge on the movable properties of the Company and mortgage on immovable properties of the Company. (2) Special Resolution: (1) Increase in the remune

    PDF · -
  • 21 Oct 2010 11:43
    Management

    Petron Engineering Construction Limited has informed the Exchange that Mr. Dinesh Kumar Khare Non-Executive Director has resigned from the Board of the Company w.e.f. October 12, 2010. With this, the strength of the Board of Directors has reduced from Five Directors to Four Directors.

  • 04 Oct 2010 13:34
    General update

    Petron Engineering Construction Limited has informed the Exchange that:"our Company has received a Service Order from ADANI INFRA (INDIA) LIMITED for "Erection, Testing, Commissioning & Performance Guarantee (PG) Tests of Boiler and its Auxiliaries alongwith Critical Piping" for Unit 1 & 2 of 1320 MW (Phase - 1:2 x 660 MW) Kawai Thermal Power Project, at Village:Kawai, Tehsil: Atru, Dist: Baran, Rajasthan, for a total contract value of Rs.164 Crores".

  • 16 Sept 2010 12:56
    AGM / meeting

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the Notice of Postal Ballot pursuant to Section 192A of the Companies Act, 1956, published in the newspaper dated September 01, 2010.

    PDF · -
  • 31 Aug 2010 13:10
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of the minutes of the Annual General Meeting of the Company held on August 3, 2010.

    PDF · -
  • 16 Aug 2010 15:36
    Other

    Petron Engineering Construction Limited has informed the Exchange that the auditors have conducted the limited review for the un-audited financial results for the quarter ended June 30,2010. A copy of the same shall be available on the NSE website (http://www.nseindia.com) under: Corporates > Latest Announcements and on the Extranet Server (/Common/Corporate Announcements).<a href=/content/corporate/PETRONENGG_LR_16082010.zip target=NEW> For more details click here.</a>

  • 05 Aug 2010 11:19
    Other

    Petron Engineering Construction Limited has submitted to the Exchange a copy of outcome of Annual General Meeting of the Company held on August 03, 2010.

    PDF · -
Coming next in news
Arrives in Phase 3. Nothing here is estimated or filled in — we only show data we have.
  • Results & board-meeting calendar
  • Dividend, split, AGM calendar
  • Headlines with source and timestamp
  • Two-line factual filing summaries